<?xml version="1.0" encoding="utf-8" standalone="yes"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>z uber move on GpMidi.Net - Beard Stuff</title><link>https://www.gpmidi.net/tags/z-uber-move/</link><description>Recent content in z uber move on GpMidi.Net - Beard Stuff</description><generator>Hugo</generator><language>en-us</language><lastBuildDate>Sat, 13 Jan 2024 15:26:11 +0000</lastBuildDate><atom:link href="https://www.gpmidi.net/tags/z-uber-move/index.xml" rel="self" type="application/rss+xml"/><item><title>Never Underestimate The Bandwidth Of A Prius Full Of Tape</title><link>https://www.gpmidi.net/posts/2024/never-underestimate-the-bandwidth-of-a-prius-full-of-tape/</link><pubDate>Sat, 13 Jan 2024 15:23:57 +0000</pubDate><guid>https://www.gpmidi.net/posts/2024/never-underestimate-the-bandwidth-of-a-prius-full-of-tape/</guid><description>&lt;p&gt;The old saying about a station wagon full of tape remains true!&lt;/p&gt;</description></item><item><title>Z Uber Move - Second Draft Of Plans</title><link>https://www.gpmidi.net/posts/2020/z-uber-move-second-draft-of-plans/</link><pubDate>Sat, 01 Feb 2020 19:45:59 +0000</pubDate><guid>https://www.gpmidi.net/posts/2020/z-uber-move-second-draft-of-plans/</guid><description>&lt;p&gt;Updated Plans!&lt;/p&gt;&#10;&lt;p&gt;First up, the door install is set for Tuesday, February 11th. Once the door is in two of the libraries (the two working ones) will come inside. I'll probably end up using movers to handle getting the boxes, shelving, tool boxes, and other stuff out to the garage. Although I'm not sure yet if I'll try to get the libraries inside before, during, or after the movers come. &lt;/p&gt;</description></item><item><title>Z Uber Move - First Draft Of Plans</title><link>https://www.gpmidi.net/posts/2019/z-uber-move-first-draft-of-plans/</link><pubDate>Tue, 31 Dec 2019 02:22:28 +0000</pubDate><guid>https://www.gpmidi.net/posts/2019/z-uber-move-first-draft-of-plans/</guid><description>&lt;p&gt;Next up in the z uber move...Getting the tape libraries from the garage to the server room. This will require installing a much larger door (two doors really), building a ramp, and moving a metric ton of boxes of gear/cables/parts/etc.&lt;/p&gt;&#10;&lt;p&gt;The current plan is to move the workshop to the garage, move the 8'x4' block of rolling shelves to where the workbench is in the workshop/server room, and then move the libraries to the spot where the rolling shelve block is. This plan will require building a workbench that folds down along with figuring out a storage solution for my various lengths of stock metal and wood.&lt;/p&gt;</description></item></channel></rss>