14 Feb 2020
The network side of my rack redo is almost done. Once the two SRX650s on top are removed it'll be good to go.
Gear
- 4x SRX650s w/ 10GbE
- 2x RackSwitch G8264
- 2x RackSwitch G8000 w/ 10GbE
- 1x Digi console serve
- 1x Avocent KVM
- 2x Voltaire Infiniband 4036 - 4xQDR (aka 40Gbps)
IB Network
The IB network will be used for Lustre.