Network Gear In Place
14 Feb 2020
The network side of my rack redo is almost done. Once the two SRX650s on top are removed it'll be good to go.
Gear
- 4x SRX650s w/ 10GbE
- 2x RackSwitch G8264
- 2x RackSwitch G8000 w/ 10GbE
- 1x Digi console serve
- 1x Avocent KVM
- 2x Voltaire Infiniband 4036 - 4xQDR (aka 40Gbps)
IB Network
The IB network will be used for Lustre.